NES

Nov. 17th, 2004 05:17 pm
varjohaltia: (Eye)
[personal profile] varjohaltia
Finally, pictures. Here's one aspect of what I do at work.



First, we look at blueprints for new buildings, figure out what kind of computer networks are needed, what equipment needs to be bought to make it happen, how much it's going to cost and all that, argue with the architect and others about how much space we get and where we can put jacks etc. Then, as the building's being built, we poke in every so often and make sure things are going smoothly.


Looks OK so far... Says Joe, in one of his demonic moods.


This is what we finally get to work with--an empty rack.


That'd be Lyle, Brady, me and Joe, in front of the finished first floor building distribution facility (BDF). Having specified all the actual equipment, it gets shipped to us, we unbox it, put on the right mounting hardware, configure the OS, lug it over, bolt it into the rack, connect everything up, and spend the better part of a week running close to 1000 connections. One patch cable in the closet, labeled, one in each room where the actual data connection ends up residing, and test each one.


Yeah. Me.

Ain't it exciting?

Those who care: we use one Cisco 2970 in each BDF/IDF to aggregate a bunch of 2950T-24s with gigabit copper. Each IDF connects to the BDF building switch via gigabit SX ethernet (multimode fiber). The building switch is whatever layer 2 fiber switch happens to make most sense. Each building then connects to the nearest phone room and a distribution Cat6500 (our campus equivalent of a central office) over gigabit LX ethernet (singlemode fiber). Each IDF gets a UPS with network management and environmental monitoring, too. And lightning protection... We're in the lightning capital of the US/world. All wireless access points cleverly concealed throughout the building get fed power over ethernet from these rooms too--all that gear is hidden behind the rack.

The entire building is wired to Category 6 standard, in a faint attempt to futureproof the wiring plant.

And that's how people here get their Internet, Internet 2 and other pr0n.


NES Back


NES Front


About a third of all the installation supplies that end up filling four racks.


NES (Natural Sciences) in itself is going to be a really sweet building. It's four occupied stories tall (with mother-of-all-HVAC-systems fifth floor) and is almost entirely classrooms, computer labs for GIS systems and meteorology and at least half of the entire building is chemistry labs. There are hydrogen, nitrogen, air and acetylene lines running throughout the facility, and more fume hoods (with emergency bypasses and air flow alarms and such), emergency showers and eye wash stations than you can shake a stick at. On the other hand, I'm happy we got to work in the building before any of the real chemicals are delivered...
This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

Profile

varjohaltia: (Default)
varjohaltia

January 2025

S M T W T F S
   1234
5678 91011
12131415161718
19202122232425
262728293031 

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated May. 25th, 2025 03:08 pm
Powered by Dreamwidth Studios